• June
  • 14
  • 2021

Excellence in Wind Turbine Life-Cycle Management

Start:14/June/2021 @ 8:30
End:15/June/2021 @ 16:30

event starts in

location

Online Interactive Conference

venue

Online Interactive Conference

Click here for more info

speakers

you need help with anything?

For any inquiries contact us directly at ask@tbmgroup.eu

 

14 – 15th June 2021Online Interactive Conference

The massive rise in wind turbine installations has been accompanied by significant shifts upwards in nameplate capacity, tower heights, rotor-blade length, and operating reliability. The turbines now increasingly attracting the attention of O&M technicians are bigger, heavier, taller, and much more complex than their predecessors. At the same time, up to 20,000 turbines around the world annually will be entering the second half of their 20-year design life, already having long since fallen out of standard manufacturer warranties. The O&M sector’s challenges will grow alongside the expansion in the number of turbines it services, and their technical demands.

Recent research shows that operation and maintenance (O&M) accounts for around 20-35 percent of the total energy costs in this sector. The forum will provide a unique opportunity to learn about best practices in O&M decision-making for both onshore and offshore assets. This event will examine the full turbine life-cycle, from the moment of its installation to eventual decommissioning, and provide one of a kind insights into cost reduction for wind turbine operators.

Over the two days you will have the opportunity to discuss a broad range of current topics crucial for wind turbine life-cycle management:

  • Challenges in O&M decision making
  • Best practice & technical innovations in wind power operations and maintenance
  • What is the best option: Lifetime Extension, Repowering or Dismantling?
  • An in-depth scrutiny of regulatory frameworks for end-of-life management
  • Best-practice in onshore wind turbine predictive maintenance
  • Exploring end-of-life scenarios for wind blades
  • A focus on onshore O&M
  • Atlantis: Shaping the future of robotized O&M in Offshore Wind

 

Additional Information

TBM Ticket Variations

(Corporate Counsel) Conference + Online Documentation 1499 Euro, (End Users) Conference + Online Documentation – 2799 USD, (End Users) Conference + Online Documentation 1499 Euro, (End Users) Conference + Online Documentation 1999 EUR, (Law Practice) Conference + Online Documentation 2499 Euro, (Solution Providers) Conference + Online Documentation – 3299 USD, (Solution Providers) Conference + Online Documentation 3499 Euro, (Solution Providers) Conference + Online documentation 3499 USD, Corporate Counsel – EUR1499, Documentation package – 999 USD, End User Delegate (Two Days Conference + Online Documentation Package) – 2499 EUR, End User Online Delegate (Two Days Online Conference + Online Documentation Package) – 1499 EUR, Online Documentation Only 1045 USD, Online Documentation Package – 899 EUR, Solution Provider Delegate Online, Vendor Delegate (Two Days Conference + Online Documentation Package) – 2999 EUR, Vendor Online Delegate (Two Days Online Conference + Online Documentation Package) – 1999 EUR

Share the event

downloads